learningCloud 5.18 —Setting pre-requisites (milestones) between sprints within a channel
Last modified:
learningCloud 5.18
Release date: 14/09/2022
Setting pre-requisites (milestones) between sprints within a channel
Until this version, navigation between stages of a channel was sequential. A user had to complete all the required sprints of a stage before moving on to the next one.
From this version onwards, the channel author can customise the navigation and set the pre-requisites for each sprint.
For example, for the second sprint of stage 2, he could set as a pre-requisite:
- Complete all the sprints in stage 1
- Complete some sprints on stage 1
- Complete the previous sprints in stage 2
- No prerequisites
From this version onwards, sequential navigation will no longer be enabled by default but all channels created before this version will keep the previous behaviour, i.e. a user must complete all required sprints of a stage before moving on to the next one.